Retroflo were engaged by Esh/Stantec (supported by NWG) to undertake the mechanical and electrical installation of the new tertiary solids removal treatment plant at Stokesley STW. The project included pipework, valves, electrical sub-distribution, and system integration for telemetry and SCADA. Works also included installation of a new sump pump, modifications to existing street lighting, and completion of NICEIC 18th Edition inspection, testing, commissioning, and associated documentation. The upgrade improves the performance and compliance of Stokesley STW.
Retroflo provided a full end-to-end service, including:
Retroflo delivered the mechanical and electrical installation of the new tertiary solids removal plant at Stokesley STW, improving treatment performance and compliance.
Above- and below-ground ductile iron pipework and valves were installed, including 350 mm, 300 mm, and 80 mm backwash systems, ensuring reliable hydraulic operation.
New electrical sub-distribution, power distribution, and control panels were installed, designed with capacity for future plant expansion. NICEIC 18th Edition inspection, testing, and certification were completed as part of full commissioning.
System integration for telemetry and SCADA was coordinated, providing real-time monitoring, control, and improved operational reliability. Additional works included a new sump pump and modifications to existing street lighting, all delivered under a turnkey M&E scope.