Pumping Station
Case Studies

The works consisted of replacing the CSO (Combined Storm Overflow). The work was required due to the existing CSO being located directly in the path of the new bridge being built and developed across the River Wear. After constructing the new CSO Chamber in its new location, Retroflo installed new screens, the Motor Control Center (MCC) and Kiosk, new instrumentation and telemetry, and relocated the BT Line.

Open the Case Study