As part of the Saltburn Bathing Waters scheme, it was required that the pumps at Tocketts Bridge work as duty / assist rather than the existing duty / standby arrangement, to handle the additional flows from Guisborough Works. In order to do this, the existing Motor Control Centre (MCC) was upgraded from 400A to 630A.