Project Summary

Retroflo were engaged by Esh/Stantec to undertake the mechanical and electrical design at the initial I&D stage (now C&D) for a new three-pump sewage pumping station. The project included design, installation, and commissioning of the pumping station and a 60 kVA permanent standby generator with auto changeover facility. The installation enhances network resilience, ensuring a minimum of 48 hours of continuous operation during mains power outages, reducing the risk of flooding and pollution.

Scope of Works

Retroflo provided a full end-to-end service, including:

  • Mechanical and electrical design at I&D stage
  • 60 kVA permanent standby generator with integral fuel tank (48 hours minimum operation)
  • Electrical design including cable calculations, SLDs, cable diagrams and loop diagrams
  • New GRP walk-in kiosk with intruder system
  • Re-purposed 3 pump MCC relocated from Johnson St
  • Three 15.0 kW VFDs
  • Three 13.5 kW submersible sewage pumps
  • 250 mm ductile iron pipework and associated valves
  • Mechanical and electrical installation, commissioning and documentation
  • Associated civils installation
  • NICEIC 18th Edition inspection, testing and certification
  •  

Results

  • Strengthened network resilience with 48-hour backup capability
  • Reliable sewage pumping with integrated VFD-controlled pumps
  • Fully compliant M&E installation with NICEIC certification
  • Turnkey delivery including civils, commissioning, and documentation
Project Details
Client

Esh/Stantec (on behalf of Northumbrian Water Group)

Project Value

£250,000

Project Highlights
Enhanced Network Resilience

Retroflo delivered the mechanical and electrical design, installation, and commissioning of a new three-pump sewage pumping station, ensuring uninterrupted operation during mains power outages and reducing flood and pollution risk.

Reliable Power Backup

A 60 kVA permanent standby generator with integral fuel tank provides a minimum of 48 hours continuous operation, with automatic changeover to maintain service continuity.

Integrated M&E Systems

The project included three submersible sewage pumps (13.5 kW) driven by VFDs, a re-purposed 3-pump MCC, GRP walk-in kiosk with intruder system, and full electrical design including cable calculations, SLDs, and loop diagrams.

Turnkey Delivery

Retroflo completed all mechanical, electrical, and civils installation, commissioning, documentation, and NICEIC 18th Edition inspection, testing, and certification, ensuring a fully compliant and future-ready facility.

Need Help With a Water Infrastructure Project?